The Georgia Department of Transportation has announced lane closures on I-285 and SR 400 for the upcoming week, starting October 23 through October 30. These closures are part of the ongoing Transform 285/400 Project and are contingent on favorable weather conditions.
Details of the Lane Closures:
Daytime Closures: From Monday, October 23, to Friday, October 27, between 7 a.m. and 5 p.m., there will be flagging operations on Long Island Drive at I-285.
Continuous Weekend Closures: Starting Friday, October 27, at 9 p.m. until Monday, October 30, at 5 a.m., one left lane on I-285 westbound from Ashford Dunwoody Road to Perimeter Center Parkway will be closed.
Overnight Closures: From Monday, October 23, to Friday, October 27, between 9 p.m. and 5 a.m., multiple lanes on I-285 (both eastbound and westbound) and SR 400 (both northbound and southbound) will be closed. Specific details for each night are available on the project web page.
Detour Information: Several detours have been set up to facilitate the flow of traffic during these closures. Motorists are advised to follow the detour signs and to check the project web page for maps and detailed instructions.
Special Notes:
The work schedule can be updated daily. Motorists are encouraged to check the project web page frequently for the latest updates.
GDOT urges motorists to be cautious when traveling through these areas, anticipate possible delays, adhere to reduced speed limits, and consider alternative routes or departure times. The department appreciates the patience and cooperation of all drivers and residents as they work to improve the transportation infrastructure in the region.