Eastside Drive, between Pleasant Wood Drive and Wesley Chapel Road, will be closed to through-traffic from 7 a.m. Monday, Sept. 27, to 7 p.m. Friday, Oct. 29, to repair a 24-inch natural gas transmission pipeline between 4205 and 4265 Eastside Drive in Decatur.
Road closure and detour signs will be placed in the area during the road closure period advising motorists of construction work in the area and of local traffic restrictions.
Questions regarding this road closure should be addressed to Erik Lombard, supervisor, Atlanta Gas Light Company, at 404-357-2263.
[mailerlite_form form_id=10]- Freeze warnings and frost advisories cover much of Georgia this weekend
- Lost Wages After a Work Injury in Atlanta: What Comp Pays
- FAA grounds all flights nationwide: What does it mean?
- Brian Kemp: A mixed legacy due to gun stance
- 3 teens arrested in murder of 18-year-old British Hart in Powder Springs

