Eastside Drive, between Pleasant Wood Drive and Wesley Chapel Road, will be closed to through-traffic from 7 a.m. Monday, Sept. 27, to 7 p.m. Friday, Oct. 29, to repair a 24-inch natural gas transmission pipeline between 4205 and 4265 Eastside Drive in Decatur.
Road closure and detour signs will be placed in the area during the road closure period advising motorists of construction work in the area and of local traffic restrictions.
Questions regarding this road closure should be addressed to Erik Lombard, supervisor, Atlanta Gas Light Company, at 404-357-2263.
- ZERO VISIBILITY: Dense fog socks 9 Georgia counties
- Why Quality Fasteners Matter More Than Ever in Modern Construction
- What Grieving Families Need to Know About the Hidden Delays That Slow Down a Settlement
- Cherokee deputies busted for spying with cop tech
- South Fulton police looking for missing 16-year-old girl
