Eastside Drive, between Pleasant Wood Drive and Wesley Chapel Road, will be closed to through-traffic from 7 a.m. Monday, Sept. 27, to 7 p.m. Friday, Oct. 29, to repair a 24-inch natural gas transmission pipeline between 4205 and 4265 Eastside Drive in Decatur.
Road closure and detour signs will be placed in the area during the road closure period advising motorists of construction work in the area and of local traffic restrictions.
Questions regarding this road closure should be addressed to Erik Lombard, supervisor, Atlanta Gas Light Company, at 404-357-2263.
- Emory University Fires Faculty Member After Social Media Post on Charlie Kirk’s Assassination
- Your Vape Pen Can Cause Fires. Here’s How to Stay Safe
- Big Changes to The ACT: What You Need to Know
- Georgia Lawmakers Vow Not to Tax Food and Housing if They Eliminate State Income Tax
- Hot, Dry Weather Raises Drought Risk For Georgia
